The focus of this phase is to confirm development feasibility and establish benchmarks.
Product Development Proposal:
The starting point of the project; once the proposal is approved, it enters formal evaluation.
New Product Feasibility Assessment Report:
A deep-dive assessment of technical, market, and other aspects to confirm if the project is viable for execution.
Sustainability Mission:
In our journey toward the future, Marwi is committed to practicing sustainable manufacturing, with a mission to "reduce emissions, create better workplaces, and ensure lasting transparency." They have set a target to reduce Scope 1 and Scope 2 emissions by 42% by 2030.
New Product Development Timeline:
Following the approval of the assessment, a clear roadmap for the development schedule is established.
This stage focuses on product visualization and preliminary design confirmation.
3D Model Drawing:
Perform digital modeling according to specifications.
Design Review I:
Conduct an audit of the preliminary design.
・Risk Control: If the review result is "No," the process returns to the "New Product Feasibility Assessment Report" for re-evaluation.
・Next Steps: If the review result is "YES," the project proceeds to more in-depth technical verification.
This is a technology-intensive phase aimed at ensuring mass production feasibility through standardized testing and analysis.
Core Tasks:
・PFMEA (Process Failure Mode and Effects Analysis): Identify potential failure points in production in advance.
・Open Mold Review: Conduct a secondary review of the structure and precision of production molds.
・ISO 4210 Testing: Execute bicycle safety standard inspections to ensure product compliance.
・Design Confirmation: Integrate the above data to confirm the stability of the design solution.
・Design Review II:
Make decisions based on the results of the T1 phase.
・Risk Control: If the review result is "No," the project must return to "Design Review I" for design revisions.
After completing all design revisions, the final admission approval is conducted.
Design Confirmation Review:
This is the final milestone before mass production, providing a summative approval of all R&D results.
・Risk Control: If the approval is not granted (No), the project must return to the Design Review II stage.
Pilot Run Organization and Execution:
Upon passing the final approval (YES), the project officially enters the pilot run phase, preparing to transition from R&D to production line implementation.